Bellevue Fire Station 2
Bellevue Fire Station 2 is a hot-water coil system with a vertical AC Unit for air distribution and cooling. It has a small Building Control System.
Variable Frequency Drives were installed in 2013 to slow down the supply and return fans from 11pm to 7am.
Lighting throughout the station consists of T-8s and compact fluorescent.
Station 2 has 8 firefighters on duty. The building size is 11,258 square feet.
Bellevue - Station 2 Cost, 2011 - 2018
Cost Trend for Bellevue Fire Station 2